* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67293Weather Stripping (1)7916Roof Beam Bracket (4)66382Lower Door Guide (4)66183Roof Trim Cap(2
Part Part Quantity Check Number Description in Carton List6615 Rear Wall Angle 26617 Door Track Splice 110498 Horizontal Door Brace 4
Part Part Quantity Check Number Description in Carton List10488 Right Door 110488 Left Door 19363 Wall Panel 29900 Door Jamb 29924 Re
The front floor frame is made up of 3pieces. The side floor frames and therear floor frame are made up of 2pieces. The holes in these pieceswill align
Step 2BY1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at t
16The roof beams join the 2 gables andsupport the roof panels. The roof as-sembly is made up of 4 pieces over-lapped back to back at the center.Hint:
17NOTE:Door Track Splice (painted part)Step 4B17● Parts Needed For ●Door Track Assembly●●●●● 6617 Door Track Splice (1)●●●●● 9378 Door Track (2)The do
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5BY18The floor frame must
1 Position the rear corner panels atthe rear corners, as shown. The wid-est part of each rear corner panelmust be placed along the rear of thebuilding
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The main frame pieces give rigidity tothe side walls and provide a surfacefor attaching the gables which sup-port the roof.1 Fasten the rear wall angl
Step 8BY21● Parts Needed For ●Wall Panels●●●●● 8995 Wall Panel (2)●●●●● 9363 Wall Panel (2)●●●●● 9364 Wall Panel (4)The wall panels come in two widths
22● Parts Needed For ●Door JambStep 9B22●●●●● 9900 Door Jamb (2)The door jambs reinforce the dooropening and provide an attractivetrim. Follow these s
23The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
24Step 11BY 24● Parts Needed For ●Gables/Braces●●●●● Left Gable Assembly (2)●●●●● Right Gable Assembly (2)●●●●● 6658 Gable Brace (2)1 Lift and fasten
25Step 12BY25● Parts Needed For ●Roof Beams●●●●● Main Roof Beam (1)●●●●● Outer Roof Beam (2)1 Fasten the main roof beam to thegable brace of the front
26Step 13P26● Parts Needed For ●Right Roof Panel●●●●● 8466 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta
1 Install a left roof panel at the leftrear and right front corner of the roof.Install a right roof panel at the leftfront corner of the roof.3 Instal
28Step 15BY28● Parts Needed For ●Ridge Caps & Panels●●●●● 8840 Ridge Cap (1)●●●●● 9978 Roof Panel (2)●●●●● 8486 Ridge Cap (1)1 Install the first r
1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA si
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30END VIEWSHOWING:Step 17B30● Parts Needed For ●Door Assembly●●●●● 10488 Right and Left Doors (2)●●●●● 10498 Horizontal Door Brace (4)●●●●● 9355 Ver
31Step 18P31● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation BY09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FR
Komentáře k této Příručce