Rwww.arrowsheds.comCustomer Service:1-800-851-1085 [email protected] BASE BUILDING DIMENSIONSCOMMANDER SERIESAll SizesGloves must be worn at
10H10 Key Carton Part Part Qty. No. No. No. Description List1 C1GA 10623 Door
11H11Extension ModulePart No. 21 (Truss Post Insert) fi ts inside Part No. 20 (Truss Post) and is not shown above.1412121212131313131416161717181819191
12Step 1: Trusses12HYou will need for this page:(QTY: 24)Washers are to be used on painted parts only. Washers are not necessary on unpainted parts an
13Step 1: ContinuedNext, insert the Upper/Lower Chord Truss Assembly into the Truss Post Assembly as shown. Secure with Small Bolts and Nuts. Do not t
14Step 2: Rear Wall14HYou will need for this page:(QTY: 15)(QTY: 8)10629Rear Frame410630Rear Wall Channel210631Rear Wall Diagonal210640Wall Post310631
15Step 2: Continued15HYou will need for this page: 7822Wall Panel2Using Small Screws, attach a Wall Panel and Corner Panel to each corner of the Rear
16Step 3: Front Wall16HYou will need for this page:(QTY: 24)(QTY: 34)Insert Front Wall Diagonals into the Front Wall Assembly as shown and secure with
17You will need for this page:Step 3: Continued17HUsing Small Screws, attach a Front Wall Panel and Corner Panel to each corner of the Front Wall
1818HYou will need for this page:(QTY: 4)(QTY: 8)Assemblies from Step 1:• Truss Assemblies (2)10632Side Frame4Step 4: Truss Installation10634Side Wa
19(QTY: 14)Roof Beam410650You will need for this page:Step 4: Continued19H4Install the Main Roof Beam and secure with two Small Bolts and Nuts at each
2SAFETY PRECAUTIONS...Safety precautions MUST be followed at all times throughout the construction of your building!Care must be taken when handling v
2020HYou will need for this page:(QTY: 18+)(QTY: 6+)Assemblies from Step 1:• All remaining Truss Assemblies10632Side Frame2+Step 4: Continued for E
21You will need for this page:Step 5: Rear Wall InstallSide Wall Channel21063321HCarefully position the Rear Wall Assembly in place at the rear of the
22You will need for this page:Step 6: Front Wall Install2Position the Door Jambs as shown and secure to the Front Wall Panel using Small Screws. Doubl
23(QTY: 4+)You will need for this page:Step 7: Wall AnglesStarting at the middle of the building, install all Side Wall Angles along the side of the b
24Step 8: Wall Panels24HEQUAL MEASUREMENTSAt this time, take a moment to ensure the building is level and square. Measure diagonally across the buildi
25You will need for this page:Step 8: Continued25H(QTY: 150+)Wall Panel10+7822(QTY: 9+)Place small bolt thru center hole where Panels overlap.Working
26Step 9: Gables26HEdge Trim (Plastic)GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS-TAKEN FOR ONE GABLE! SEPARATE GABLES BEFOR
27You will need for this page:Step 9: Continued27HInstall Track Support.Working with one Gable at a time, attach the Gables to the top Rear Frame with
28You will need for this page:Step 9: Continued28HCUTTape BOTH Gable joints before installing Roof Beams.Weather Stripping TapeTop View of GablesTape
29You will need for this page:Step 9: Continued29HBeam Brace19204Tab end attaches to Roof Beam.Angled end attaches to Gable.Attach Brace to Gable then
3ASSEMBLY TIPS & TOOLSHow to Select and Prepare Your Building Site: Before you start to assemble your building, you will want to decide on a good
3030HRoof Install Prep PageAt this time, take a moment to ensure the building is level and square. Measure the building diagonally again to make sure
31Step 10: End Panels31HAn Awl may be used to help align holes that are only slightly misaligned. Take care not to bend or warp the metal, and always
32Roof Assembly Chart32H10’x10’(3,0 m x 3,1 m) 10’x15’(3,0 m x 4,6 m) 10’x20’(3,0 m x 6,1 m) 10’x25’(3,0 m x 7,5 m) 10’x30’(3,0 m x 9,0 m) EP RPRPRP R
33Seal RidgeStep 11: Roof Assembly33HRoof Panel67743Attach Panels #5 - #10 according to the diagram on page 30.Weather stripping tape should be applie
34CDSBStep 11: Continued34HDO NOT fully tighten Ridge Cap bolts until you have both Ridge Cap bolts in place. This will ease assembly. Bolts must be f
35Step 11: Continued for Extension Modules35H(QTY: 32+)Roof Panel4+7743(QTY: 8+)Continue to apply weather stripping.Install two more Roof Panels. Cont
36Step 11: Continued36HYou will need for this page:At this point there should be only two Roof Panels remaining. Install last two Roof Panels. Because
37Step 12: Roof Trim37HRoof Trim Caps are positioned as shown.You will need for this page:Slide Peak Cap legs under Ridge Cap and secure Ridge Cap en
3838HStep 13: Door AssemblyRefer to page 11 for Door assembly overview.Position Door Panels as shown and secure using Small Bolts and Nuts. NOTE: Doo
3939HStep 13: Door AssemblyHoles in Door Brace must line up with holes in Door Panel.2Position Horizontal Door Braces, and Vertical Door Brace (Hinge
4BEFORE YOU BEGIN...04HYour Commander Shed has a Modular Design.This means your Commander Shed can be extended to virtually any length with the addit
40You will need for this page:Step 13: Continued40HSlide Vertical Door Braces into position with ends inside Horizontal Door Braces. Double check tha
41You will need for this page:Step 13: Continued41HA: Position parts as shown and secure to upper inside corner of left Door with Large Screws. Sprin
42You will need for this page:Step 13: Continued42H5Secure all Diagonal Braces to the Vertical Door Braces with Large Screws as shown. Next, position
43If holes do not align, insert screw at an angle.You will need for this page:Step 13: Continued43HINSIDEOUTSIDEINSIDEOUTSIDEINSIDEOUTSIDESecure the H
44Step 13: ContinuedYou will need for this page:Slide Bolt16677944HHanging the Doors:After the doors have been assembled, install hinges on one door u
45ANCHORING OPTIONS...The entire fl oor frame MUST be securely anchored once the building is erected. Below are recommended ways of anchoring. Anchori
46CARE & MAINTENANCE...Exterior Care:For a long lasting fi nish clean and wax the exterior surface. We recommend washing with a mild soap solution.
47ARROW ACCESSORIES...* Some drilling required to fi t buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 cm)
ASSEMBLY NOTES48HSlide Bolt may need adjustment to align properly.If Slide Bolt does not align properly, you may need to insert plastic washers betwee
5CONSTRUCTING A BASE...OPTION 1: Concrete SlabThe slab should be at least 4” (10,2 cm) thick. It must be leveland fl at to provide good support for the
6HARDWARE - C1GA06HConfi rm that all hardware and parts are present before attempting to assemble your building.For missing parts contact Custom
7 Key Part Part Qty. No. No. Description List51112341207H1 10651 Latch Pla
08H8 Key Carton Part Part Qty. No. No. No. Description List1 C1GA 7743 Roof Pa
09H9Part No. 30 (Truss Post Insert) fi ts inside Part No. 29 (Truss Post) and is not shown below.SNAP1062710627Part 10627 Front Wall Channel (No. 18) m