Owner's Manual & Assembly Instructions M01708670310Model No. WH109-A Exterior Dimensions
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67545Weather Stripping (1)66382Lower Door Guide (4)66183Roof Trim Cap(2 right & 2 left)66045H
Assembly Key # Part Number Part Description Qty in Carton Checklist1 5986 Rear Wall Angle 22 6085 Roof Beam Bracket 43 6114 Small Ri
13Assembly by Key No. M13
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2M1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at th
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5K18The floor frame must b
1 Position right & left corner postsat the corners of the floor frame asshown. The angled end of each postmust be placed on top for all fourcorner
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The door jambs reinforce the dooropening and provide an attractivetrim. The splice posts support thewall.1 Position a rear splice post at thecenter o
21●●●●● Side Wall Channel Assemblies (2)●●●●● Rear Wall Channel Assembly (1)●●●●● 9003 Stud (6)●●●●● 9365 Front Wall Channel (2)● Parts Needed For ●Mi
Each screw in the wall requires awasher.1 Slide side siding (5 board) intochannels of corner and splice posts,flat edge upward, slotted edge downresti
23The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
● Parts Needed For ●Gables/Roof BeamsStep 11M24●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● Single Roof Beam (4)●●●●● 6636 Gab
● Parts Needed For ●Roof Beam/BracesStep 12K25●●●●● Main Roof Beam (1)●●●●● 6227 Roof Beam Brace (2)251 Fasten the track supports to thefront gable as
26Step 13M26● Parts Needed For ●Right Roof Panel●●●●● 7952 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin instal
1 Install a left roof panel at the leftrear corner of the roof.2 Install four roof panels in thesequence and positions shown onprevious page. Follow
1 Install three ridge caps on thecompleted roof section using boltsand nuts. Do not fasten the ends ofridge caps until instructed to do so.2 Fasten
1 Attach the side roof trim to thelower end of the roof panels on eachside of the building using screws ateach panel overlap.NOTEA single screw fasten
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30●●●●● 67730 Foam Board (2)●●●●● 10509 Right and Left Doors (2)●●●●● 10501 Horizontal Door Brace (4)●●●●● 8109 Vertical Door Brace (2)● Parts Neede
31Step 18Y31● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,
AnchoringAnchor your building at this time.Floor FrameIf you have purchased a Floor Frame Kit you need to install it at this time.Anchoring and Floor
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 c
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
105"266,7 cmThe Base For Your Building9FRONT(DOOR)FRONT(DOOR)Base K09121"307,3 cm16"/24"40,6 cm/61,0 cmOPTION 1: ARROW FLOOR F
Komentáře k této Příručce